JW Marriott Absheron - STRABAG Azerbaijan MMC
Geodetic and Topographic Works Carried Out in the JW Marriott Absheron Baku Project
- Conducting topographic surveys of the project area
- Establishment of a geodetic control network and coordinate system
- Mapping existing buildings, utilities, and terrain features
- Measurement of elevations (leveling) and preparation of elevation plans
- Setting out building axes and construction reference points
- Geodetic control of foundations and load-bearing structures
- Monitoring of deformations and settlements during construction
- As-built surveys and preparation of as-built drawings