GeoTotal

Hilton Baku - EDC Construction Co.

Geodetic and Topographic Works Carried Out at the Hilton Baku Project

  • Geodetic surveys of the hotel construction site: Site measurements for planning purposes, including determination of coordinates and elevation data required for hotel construction.
  • Setting out of the hotel building according to the design: Marking of main building axes to ensure accurate positioning of the hotel structure in compliance with the project documentation.
  • Vertical axis and elevation control: Continuous control of vertical alignment and floor elevations during floor-by-floor construction of the hotel building.
  • Geodetic control of reinforced concrete structures: Survey control during installation of foundations, columns, core walls, beams, and floor slabs.
  • As-built surveys and final documentation: Execution of as-built measurements and preparation of final as-built drawings for project completion.
Hilton Baku
certificate