Hilton Baku - EDC Construction Co.
Geodetic and Topographic Works Carried Out at the Hilton Baku Project
-
Geodetic surveys of the hotel construction site:
Site measurements for planning purposes, including determination
of coordinates and elevation data required for hotel construction.
-
Setting out of the hotel building according to the design:
Marking of main building axes to ensure accurate positioning
of the hotel structure in compliance with the project documentation.
-
Vertical axis and elevation control:
Continuous control of vertical alignment and floor elevations
during floor-by-floor construction of the hotel building.
-
Geodetic control of reinforced concrete structures:
Survey control during installation of foundations, columns,
core walls, beams, and floor slabs.
-
As-built surveys and final documentation:
Execution of as-built measurements and preparation
of final as-built drawings for project completion.